PERMITTING AND USE INFORMATION FOR BIOCLERE SYSTEMS
| Technology Name | To be installed in designated nitrogen sensitive area | Flow design over 2000 gpd? | DEP approval status | DEP permit required | DEP
Fee |
Send application and/or permits to |
| BIOCLERE | NO | YES or NO | General | No DEP permit req. unless Title 5 variance required; if so use BRP WP 59b. | if needed, BRP WP 59b= $200 | BRP WP 59b to DEP Regional Office |
| YES | YES or NO | Provisional | BOH approval with transmittal form to DEP. No DEP permit req. unless Title 5 variance required; if so use BRP WP 59b. | if neeeded, BRP WP 59b= $200 | Local approval and plans to DEP Boston. BRP WP 59b to DEP Regional Office | |
| Remedial | None, provided use of technology is consistent with DEP approved conditions for remedial use. If Title 5 variance req. use BRP WP 59b | if needed, BRP WP 59b= $200 | BRP WP 59b to DEP Regional Office |
| Technology Name | To be installed in designated nitrogen sensitive area? | Flow design over 2000 gpd? | DEP approval status | DEP Monitoring Requirements | Nitrogen Credit in areas otherwise limited to 440 gpd/acre (systems < 2000 gpd only) | Other Conditions/ Allowances for Use |
| BIOCLERE | NO | YES or NO | General | none required by DEP; BOH may require at its discretion | not applicable | must be under maintenance agreement with MA certified operator at all times |
| YES | NO | Provisional | influent and effluent monthly 1st 6 mo., quarterly thereafter for pH, BOD, TSS, TKN, NO3, NH3 | 660 gpd/acre residential use, 550 gpd/acre non-residential use for new construction; remedial use-2 BR on 10,000 sf. lot may expand to 3BR; 2 BR on 15,000 sf may expand to 4 BR; 3BR on 15,000 sf. may expand to 4 BR. | must be under maintenance agreement with MA certified operator at all times | |
| YES | YES | Provisional | influent and effluent monthly 1st 6 mo., quarterly thereafter for pH, BOD, TSS, TKN, NO3, NH3 | no credit allowed for systems over 2000 gpd | must be under maintenance agreement with MA certified operator at all times | |
| YES or NO | Remedial | influent and effluent monthly 1st 6 mo., quarterly thereafter for pH, BOD, TSS, TKN, NO3, NH3 | 2 BR on 10,000 sf. lot may expand to 3BR; 2 BR on 15,000 sf may expand to 4 BR; 3BR on 15,000 sf. may expand to 4 BR. | must be under maintenance agreement as above. may be used in soils with perc 60-90 min/in at loading rate of 0.15 gpd/sf. 50% reduction in size of SAS or2 ft reduction of req. groundwater separation or 2 ft reduction in req. depth of naturally occurring soil under SAS allowed. |