PERMITTING AND USE INFORMATION FOR SANECO INTERMITTENT SAND FILTERS

Technology Name To be installed in designated nitrogen sensitive area Is flow design over 2000 gpd? DEP approval status DEP permit required DEP
Fee
Send application and/or permits to
SANECO INTER-
MITTENT
SAND FILTERS
YES or NO
no nitrogen credit
YES or NO General None, unless Title 5 variance required; if so use BRP WP 59b if needed, BRP WP 59b= $200 BRP WP 59b to DEP Regional Office
      Remedial None provided use is consistent with DEP approved conditions for remedial use. If Title 5 variance req. use BRP WP 59b if needed, BRP WP 59b= $200  

 

Technology Name To be installed in designated nitrogen sensitive area? Is flow design over 2000 gpd? DEP approval status DEP Monitoring Requirements Nitrogen Credit in areas otherwise limited to 440 gpd/acre (systems < 2000 gpd only) Other Conditions/ Allowances for Use
SANECO INTER-
MITTENT
SAND
FILTERS
YES or NO YES or NO General none required by DEP; BOH may require at irs discretion not applicable sand filter shall be sized so that loading rate does not exceed 1.2 gal/sf/day must be under maintenance agreement with MA certified operator at all times
  YES or NO YES or NO Remedial effluent quarterly for pH, BOD, TSS not applicable must be under maintenance agreement as above. may be used in soils with perc 60-90 min/in at loading rate of 0.15 gpd/sf. 50% reduction in size of SAS or2 ft reduction of req. groundwater separation or 2 ft reduction in req. depth of naturally occurring soil under SAS allowed.