PERMITTING AND USE INFORMATION FOR SINGLE HOME FAST SYSTEMS

Technology Name To be installed in designated nitrogen sensitive area Is flow design over 2000 gpd? DEP approval status DEP permit required DEP

Fee

Send application and/or permits to
SINGLE HOME FAST NO up to 550 gpd design flow allowed General No DEP permit req. unless Title 5 variance required; if so use BRP WP 59b. if neeeded, BRP WP 59b= $200 BRP WP 59b to DEP Regional Office
  YES up to 550 gpd design flow allowed Provisional BOH approval with transmittal form to DEP. If Title 5 variance required use BRP WP 59b. if neeeded, BRP WP 59b= $200 BOH approval, plans and manufacturers transmital form to DEP Boston. BRP WP 59b to DEP Regional Office
  YES or NO up to 550 gpd design flow allowed Remedial None, provided use of technology is consistent with DEP approved conditions for remedial use. If Title 5 variance req. use BRP WP 59b if needed, BRP WP 59b= $200 BRP WP 59b to DEP Regional Office

Technology Name To be installed in designated nitrogen sensitive area? Is flow design over 2000 gpd? DEP approval status DEP Monitoring Requirements Nitrogen Credit in areas otherwise limited to 440 gpd/acre (systems <2000 gpd only) Other Conditions/ Allowances for Use
SINGLE HOME FAST NO up to 550 gpd design flow allowed General none required by DEP; BOH may require at its discretion not applicable must be under maintenance agreement with MA certified operator at all times
  YES up to 550 gpd design flow allowed Provisional influent and effluent monthly 1st 6 mo., quarterly thereafter for pH, BOD, TSS, TKN, NO3, NH3 660 gpd/acre for residential; 550 gpd/acre for non-residential use. 2 BR on 10,000 sf. lot may expand to 3BR; 2 BR on 15,000 sf may expand to 4 BR; 3BR on 15,000 sf. may expand to 4 BR. must be under maintenance agreement with MA certified operator at all times
  YES or NO up to 550 gpd design flow allowed Remedial effluent quarterly pH, BOD, TSS, must be under maintenance agreement as above. may be used in soils with perc 60-90 min/in at loading rate of 0.15 gpd/sf. 50% reduction in size of SAS or 2 ft reduction of req. groundwater separation or 2 ft reduction in req. depth of naturally occurring soil under SAS allowed.