| SINGLE HOME FAST |
NO |
up to 550 gpd design flow allowed |
General |
No DEP permit req. unless Title
5 variance required; if so use BRP WP 59b. |
if neeeded, BRP
WP 59b= $200 |
BRP WP 59b to DEP Regional Office |
| |
YES |
up to 550 gpd design flow allowed |
Provisional |
BOH approval with transmittal
form to DEP. If Title 5 variance required use BRP WP 59b. |
if neeeded, BRP
WP 59b= $200 |
BOH approval, plans and manufacturers
transmital form to DEP Boston. BRP WP 59b to DEP Regional Office |
| |
YES or NO |
up to 550 gpd design flow allowed |
Remedial |
None, provided use of technology
is consistent with DEP approved conditions for remedial use. If Title 5
variance req. use BRP WP 59b |
if needed, BRP WP 59b= $200 |
BRP WP 59b to DEP Regional Office |
| Technology Name |
To be installed in designated
nitrogen sensitive area? |
Is flow design over 2000 gpd? |
DEP approval status |
DEP Monitoring
Requirements |
Nitrogen Credit in areas
otherwise limited to 440 gpd/acre (systems <2000 gpd only) |
Other Conditions/ Allowances
for Use |
| SINGLE HOME FAST |
NO |
up to 550 gpd design flow allowed |
General |
none required by DEP; BOH may
require at its discretion |
not applicable |
must be under maintenance agreement
with MA certified operator at all times |
| |
YES |
up to 550 gpd design flow
allowed |
Provisional |
influent and effluent monthly
1st 6 mo., quarterly thereafter for pH, BOD, TSS, TKN, NO3, NH3 |
660 gpd/acre for residential;
550 gpd/acre for non-residential use. 2
BR on 10,000 sf. lot may expand to 3BR; 2 BR on 15,000 sf may expand to
4 BR; 3BR on 15,000 sf. may expand to 4 BR. |
must be under maintenance agreement
with MA certified operator at all times |
| |
YES or NO |
up to 550 gpd design flow allowed |
Remedial |
effluent quarterly pH, BOD,
TSS, |
|
must be under maintenance agreement
as above. may be used in soils with perc 60-90 min/in at loading rate of
0.15 gpd/sf. 50% reduction in size of SAS or 2
ft reduction of req. groundwater separation or 2 ft reduction in
req. depth of naturally occurring soil under SAS allowed. |